museum emergency recreation construction maps calendar

City Links

Public Works Department
655 North 1250 West
Centerville, UT 84014
P: (801) 292-8232
F: (801) 292-8251

 

Public Works Director
Randy Randall

 

Deputy Director/Water Supervisor
Mike Carlson

 

Streets Division Supervisor
Ken Williams

 

Drainage Utility Supervisor
Dave Walker

 

GIS Specialist
Mike Smith

 

City Engineer
Kevin Campbell
ESI Engineering, Inc.
3500 South Main, Suite 206
Salt Lake City, UT 84115
P: (801) 263-1752
F: (801) 263-1780
 

 


Street Maintenance Procedures

Street maintenance begins as early as mid-April and can continue until mid-October.  We work hard at notifying residents that live on the streets that are immediately affected with these projects.  If your home is tagged with information about road maintenance and it conflicts with construction, parties, weddings, etc, call the Public Works Dept as soon as possible so options can be looked at.  The scheduled day of the work is usually too late.  
Slurry seal is a rejuvenator that reseals the road surface.  It is a sand-emulsion mixture that is spread upon the asphalt from curb to curb.  This product will be ready for traffic in 6-8 hours after application.  
Crack Seal is a rubberized asphalt material that fills the cracks and helps seal the road surface.  It keeps moisture from seeping into the sub-base.  This is usually performed one year prior to the slurry seal.  This product can be ready for traffic almost immediately.